TOHA building in Tel Aviv

Specialty

Construction time savings – use of MIG-ESP ® materials instead of complex mineral wool cladding

Project description

  • Frame construction
  • Coating of the reinforced concrete ribs on the outside of the facade
  • Avoidance of water leaks on the fairing (caused by mineral wool insulation)